Deferred Engineering Costs |
6 Months Ended |
---|---|
Jun. 30, 2020 | |
Deferred Costs [Abstract] | |
Deferred Engineering Costs | NOTE 4 — DEFERRED ENGINEERING COSTS As of June 30, 2020, the deferred engineering balance of approximately $109.9 million represents detailed engineering services related to the planned construction of the Driftwood terminal. This balance will be transferred to construction in progress upon reaching FID. |
X | ||||||||||
- Definition Disclosure of Deferred Costs [Text Block] No definition available.
|
X | ||||||||||
- References No definition available.
|