Quarterly report pursuant to Section 13 or 15(d)

Deferred Engineering Costs

v3.19.3
Deferred Engineering Costs
9 Months Ended
Sep. 30, 2019
Deferred Costs [Abstract]  
Deferred Engineering Costs
NOTE 4 — DEFERRED ENGINEERING COSTS
As of September 30, 2019, the deferred engineering balance of approximately $96.5 million represents detailed engineering services related to the planned construction of the Driftwood terminal. This balance will be transferred to construction in progress upon reaching FID.