Quarterly report pursuant to Section 13 or 15(d)

Deferred Engineering Costs

v3.10.0.1
Deferred Engineering Costs
6 Months Ended
Jun. 30, 2018
Deferred Costs [Abstract]  
Deferred Engineering Costs
NOTE 3 — DEFERRED ENGINEERING COSTS
Deferred engineering costs of approximately $44.1 million as of June 30, 2018 represent detailed engineering services related to the Driftwood terminal. Such costs will be deferred until construction commences on the Driftwood terminal, at which time they will be transferred to construction in progress.