NOTE 3 — DEFERRED ENGINEERING COSTS
Deferred engineering costs of approximately $31.7 million as of March 31, 2018 represent detailed engineering services related to the Driftwood terminal. Such costs will be deferred until construction commences on the Driftwood terminal, at which time they will be transferred to construction in progress.