Deferred Engineering Costs

v3.10.0.1
Deferred Engineering Costs
12 Months Ended
Dec. 31, 2018
Deferred Costs [Abstract]  
Deferred Engineering Costs
NOTE 3 — DEFERRED ENGINEERING COSTS
Deferred engineering costs of $69.0 million at December 31, 2018 and $18.0 million at December 31, 2017 represent detailed engineering services related to the Driftwood terminal. Such costs will be deferred until construction commences on the Driftwood terminal, at which time they will be transferred to construction in progress.