Deferred Engineering Costs |
12 Months Ended |
---|---|
Dec. 31, 2017 | |
Deferred Costs [Abstract] | |
Deferred Engineering Costs |
NOTE 3 — DEFERRED ENGINEERING COSTS
Deferred engineering costs of $18.0 million at December 31, 2017, represent detailed engineering services related to the Driftwood terminal. Such costs will be deferred until construction commences on the Driftwood terminal, at which time they will be transferred to construction in progress. The $18.0 million of deferred engineering costs includes $9.0 million which is recorded in accounts payable.
|
X | ||||||||||
- Definition Disclosure of Deferred Costs [Text Block] No definition available.
|