Quarterly report pursuant to Section 13 or 15(d)

Deferred Engineering Costs

v3.20.1
Deferred Engineering Costs
3 Months Ended
Mar. 31, 2020
Deferred Costs [Abstract]  
Deferred Engineering Costs
NOTE 4 — DEFERRED ENGINEERING COSTS
As of March 31, 2020, the deferred engineering balance of approximately $109.0 million represents detailed engineering services related to the planned construction of the Driftwood terminal. This balance will be transferred to construction in progress upon reaching FID.