Annual report pursuant to Section 13 and 15(d)

DEFERRED ENGINEERING COSTS

v3.19.3.a.u2
DEFERRED ENGINEERING COSTS
12 Months Ended
Dec. 31, 2019
Deferred Costs [Abstract]  
DEFERRED ENGINEERING COSTS
NOTE 6 — DEFERRED ENGINEERING COSTS
Deferred engineering costs of $106.4 million at December 31, 2019 and $69.0 million at December 31, 2018 represent detailed engineering services related to the Driftwood terminal. The balance in this account will be transferred to construction in progress upon reaching an affirmative FID by the Company’s board of directors.