Quarterly report pursuant to Section 13 or 15(d)

Deferred Engineering Costs

v3.19.2
Deferred Engineering Costs
6 Months Ended
Jun. 30, 2019
Deferred Costs [Abstract]  
Deferred Engineering Costs
NOTE 3 — DEFERRED ENGINEERING COSTS
As of June 30, 2019, the deferred engineering costs of approximately $86.6 million represent detailed engineering services related to the planned construction of the Driftwood terminal. Such costs will be transferred to construction in progress upon reaching FID.