Deferred Engineering Costs
DEFERRED ENGINEERING COSTS
Deferred engineering costs of $9.0 million represent detailed engineering services related to the Driftwood Project. Such costs will be deferred until construction commences on the Driftwood Project, at which time they will be transferred to construction in progress.